Sports facilities section banner

Sports facilities

Changing rooms: wet floors, hooks, benches and the questions to put to a specifier.

Golf Course Drainage vs Clubhouse Patio Drainage Boundary Engineering guide to golf course drainage, fairway drainage collector mains, subsurface turf drainage trenches, and clubhouse patio perimeter cutoffs.

Putting Green Construction: USGA vs California Profiles Engineering comparison of USGA two-tier and three-tier putting green construction profiles vs the California unamended sand method and gravel bridging rules.

Golf Course Irrigation Pressure and Uniformity: Head Spacing, Precipitation Rate, and Catch-Can Audits Plan a golf course irrigation audit: check nozzle pressure, review sprinkler head spacing, calculate precipitation rate, and assess catch-can uniformity.

Golf Cart Path Asphalt vs Concrete Thickness: Axle Loads, Subbase Compaction, and Cross-Slope Drainage Engineering comparison of golf cart path asphalt and concrete thickness, maintenance fleet axle loads, subbase compaction, contraction joint spacing, cross-slope drainage, and root barriers.

Bunker Sand Particle Size and Drainage: USGA Gradation, Crusting Resistance, and Liner Underdrains Specify golf course bunker sand particle size (0.25–1.0 mm >= 65%, silt and clay <= 3%), > 2.4 kg/cm² penetrometer firmness, bunker liner blankets, and 4-inch herringbone bunker drainage.

Locker Room Design: Negative-Pressure Ventilation, Wet-Zone Separation, Benches, and Plinth Lockers Engineering guide to golf and country club locker room design: 8–10 ACH negative-pressure exhaust, raised locker plinths, >=1.8 m locker room benches aisles, and GFCI wet-zone separation.

Changing rooms: benches, hooks and water on the tile What to look at in a golf changing room: the bench, the hook rail, and whether water reaches a drain.